1
/
of
1
Stevvex
2 Color Retractable Dual Double Pet Leash Rope Walk For Dog Long Lead-Training Pet Leash Pet Tractor Small And Medium Dog Cat
2 Color Retractable Dual Double Pet Leash Rope Walk For Dog Long Lead-Training Pet Leash Pet Tractor Small And Medium Dog Cat
Regular price
$21.99 USD
Regular price
$55.00 USD
Sale price
$21.99 USD
Unit price
/
per
Shipping calculated at checkout.
Couldn't load pickup availability
Description:
- DURABILITY AND SAFETY- This dog training leash is made of sturdy nylon, which is durable and perfectly protects your dog. Chrome-plated hooks enhance 360° rotation at the joint.
- COMFORTABLE HANDLE- The ergonomic non-slip handle is easy to grasp and provides a pleasant walking experience for your pet, without worrying that the dog leash will hurt your hand.
- EASY TO USE- Quick lock, pause and unlock buttons-easy to operate with your thumb. No tangles, it is very suitable for walking, jogging, running, camping and hiking, or going out for a leisurely stroll in the backyard.
Brand Name: STEVVEX Pets
Model Number: ST12DB767QWS
Type: Leashes
Dog Leash Type: Double Leashes
Material: Nylon
Season: All seasons
Pattern: Solid
Feature: LIGHTS
Materials
Materials
Shipping & Returns
Shipping & Returns
Dimensions
Dimensions
Care Instructions
Care Instructions
Share

-
Free Shipping
Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.
-
Hassle-Free Exchanges
Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.