Skip to product information
1 of 2

Stevvex

Pet Leashes Rope Outdoor Training Running Dog Leash Belt Dogs Lead For Small And Large Dog Long Lead-Training Leash/Long Line Dog Leash Great for Dog/Puppy

Pet Leashes Rope Outdoor Training Running Dog Leash Belt Dogs Lead For Small And Large Dog Long Lead-Training Leash/Long Line Dog Leash Great for Dog/Puppy

Regular price $17.99 USD
Regular price $45.00 USD Sale price $17.99 USD
Sale Sold out
Shipping calculated at checkout.
Color
Size

 Description:

  • LIGHTWEIGHT AND NOT ABSORB WATER- Soft and lightweight; Non-absorbent material wont get more and more heavy in the water and wont sink, the long dog leash will float when submerged and highly visible against any background
  • GREAT DESIGN- The stitching is reinforced and the nickel-plated clip swivels to resist twisting; The joints of the rope are sewn by the machine, which is very strong and not easy to fall off
  • LONG DOG LEAD-  Also Great for Camping, Hunting, Hiking, Backyard, Beach Play, and other activities. Sturdy, strong and firm control of any dogs

Brand Name: STEVVEX Pets
Model Number: ST12DB786GBI

Type: Leashes
Dog Leash Type: Basic Leashes
Material: Nylon
Type: Dogs
Season: All seasons
Pattern: Solid
Feature: Personalized
Feature: outdoor training dog leash rope
Use for: puppy, small medium and large dog belt
Use for 1: training, running dog lead

Materials

Shipping & Returns

Dimensions

Care Instructions

View full details
  • Free Shipping

    Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.

  • Hassle-Free Exchanges

    Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.